Studentbostäder has hired contractor Grebo el to replace old fixtures in the common areas on adress 2 A, B, C and 4 D (not the common kitchens). The work starts today and is expected to be completed by February.
Viktig information gällande sopsugsanläggningen
During the month of December, our contractor will replace parts of the basement floor at Vallavägen 6-8.You will be able to walk there but on limited surface.
Unfortunately, our detergent supplier has had problems with their deliveries. We have got a preliminary answer that the detergent will be refilled tomorrow (17/11). Let´s hope that nothing goes wrong until then.
Mätning i fastigheter där vi har har haft ett större ROT-projekt samt i nybyggnationsprojekt.
A fire on the stove was quickly put out due to resourcefully actions by neighbor